Step 1: Product
What runs on this line. Optional, but dimensions help us suggest the right accumulator.
Step 2: Machine line-up
Enter each machine's rated speed and how often it stops. We find the bottleneck.
Only add accumulators already on your line. We'll recommend new ones in your results.
No machines added yet
Add each piece of equipment in your line, then enter its rate and downtime to find the bottleneck.
Step 3: Operating schedule
Shifts and profit per product turn lost throughput into money.
Step 4: Improve the line
Add accumulators or equipment upgrades and see what they're worth.
Add at least 2 machines to configure an accumulator
Add an accumulator to the line (in step 2), or select one above, with at least one machine on each side. The fill level and speed advice will appear here.
Step 5: Compare and share
Save versions of this line side by side, and add notes for the PDF report.
No scenarios saved yet. Configure your line and save it as a scenario to compare different configurations.
Results
Add your machines to see the bottleneck, line uptime and payback here.
